!Template ver: 11:47 2018-01-10 Mods: 2015-04-30 ---------------------------------------------------------------------------------------------------------- 10:23 2018-09-25 Went to Certified Fire Company Invited: Fire Suppression Services (Salt Lake City, UT) CALLOUT A Due Date: Manager: Seth Radford (maybe) else Arun Phone: Mechanical: Architect: UTAH Engineering BNA Consulting (Electrical) Kim HArding tolde 'em to go get MEP AHJ/FM: Unified Fire Authority. 3rd Party Review required. Shirl White OWNER: Robert Jahries. rjahries@libertytire.com http://www.libertytire.com/ J&R Realty? Via Cushman Wakefield Management Co. TENANT: Seth Radford. (801) 859-5589 (of Campfire Lounge Sugarhouse: we did the hood) PERMIT: eg: BLD201Y-##### PROJECT STATUS: (Open to Bid) JOB: Riverbank Bar, Mill Creek JOB#: RBMCTI (interim) START DATE: PROJECT LOCATION: Site: 1306 Woodland Ave. Millcreek UT 84106 PARCEL INFORMATION: Sales Taxable: YES/NO Note: TU = Tilt Up TI = Tenant Improvement DESCRIPTION AND: 13:30 2018-04-06 I am awaiting a drawing set to be sent this evening. Then after previewing it, we can contact him, to visit. 09:04 2018-05-04Tenant has to discuss with Owner: Cushman Wakefield About Owner buying a property with no adequate water supply And wanting to do Change-of-use from Bank, to Restaurant Bar. Public Utilities doing a giggle over logic of buying without checking. :) i.e. We are on hold on this site Was a Chase bank. It is being gutted. According to Seth, there is no wet suppression riser? ---------------------------------------------------------------------------------------------------------- CALL OUT B Divisions that I require an answer/bid from BY RETURN email please. the div list here will be annotated accordingly [options are: BID/NoBid] Div-10 Fire Protection Specialties REQUIRED Div-21 Fire Suppression Sprinklers etc REQUIRED Div-28 Life Safety Fire Alarms REQUIRED Div-31-33 Ground REQUIRED From Unicad I talked to Brady. This building will now be an A-2 occupancy. If it is over 1500 sq. ft. the code calls for a “manual system”. I recommend your client offer to go 1 step beyond that requirement and offer to provide full automatic detection in lieu of a sprinkler system. The AHJ has the final say. Mark Elison. Sales & Estimating UNICAD, Inc. 5794 W 4600 S Hooper, UT 84315 mark@unicad.net Mobile: (801) 842-2145 From Arun Sometimes I do NOT know what divs are required. you will have to check, and advise me if you notice, & I shall update the !Notes.txt here. ---------------------------------------------------------------------------------------------------------- CALLOUT C for you to observe the PlanRoom Folders that have data. e.g.: Addenda, Plans, Pics, Docs you will need to check folders that may be added to from time to time, i won't always advise you. //====================================================================== CALLOUT Z TAKE NOTE: - Sprink Inspectors; - Hood Installer, - Hood Cleaner - Alarm Manager - Extinguisher & Cabinet Group be Advised: ALL FIRE SUPPRESSION DIVISIONS ARE SUBJECT TO: DIVISION 23 SECTION 23 05 50 - OPERATIONS & MAINTENANCE MANUALS; Identification of Pipe-Work; - Training of Maint Staff and other personel; Warranty. This is a CONDITION of the A201 Contract & Scope on ALL CONTRACTS. I don't want to hear about it! We MUST Supply/Deliver to the Customer: - Hands-on & Lecture TRAINING AND - we invite the local Fire Crew out to view the fittings and FDC & Riser Location. - We MUST Supply: - a Training Manual (Three Hard Copies) AND - Full-Size AS-BUILT drawings. (Three Hard Copies) - All Installation, Operation, Instruction & Repair Manuals for the installed equipment. - And all also cut onto a CD/DVD size disc. (Three Copies) Arun (Mr.) Compliance Manager 2016-Oct-17 //======================================================================