!Template ver: 2015-04-30 ---------------------------------------------------------------------------------------------------------- Company Invited: Fire Suppression Services (Salt Lake City, UT) CALLOUT A Due Date: ASAP 10:46 2018-09-25 Calling Dave .... 10:57 2018-09-17 tried calling Dave & Matt Job#: BRCTI#F Manager: General: Dave Peterson (Lives in St. George) (435) 229-8965 Site PM: Matt Weeks Phone: (801) 979-8021 Matt@beckutah.com ARCHITECT: Don Welch (801) 548-6391 AHJ/FM: UFA Shirl White. SALT LAKE COUNTY OWNER: BRC LAND 900, LLC (TUG Holdings) Thomas Godfrey PERMIT: eg: BLD201Y-##### With Salt Lake COUNTY PROJECT STATUS: (Open to Bid) START DATE: ASAP PROJECT LOCATION: 4905-4953 S 900 E Murray PARCEL INFORMATION: 22081850140000 type: 701 Sales Taxable: YES Note: TU = Tilt Up TI = Tenant Improvement RED Wire with Romex into same junction box? For lighting Control? Change to grey or other? Consider tiles or access hole each side of where conduit exits a building to pass over breezeway to next building. DESCRIPTION New Construction Six Commercial Residential type bldgs. 30,000 SF Was a State Fire Job. Building F has a conference room/kitchen Two buildings are already framed. AND: SITE VISIT 2018-08-23 Heath & Mike Zach. DONE ---------------------------------------------------------------------------------------------------------- CALL OUT B Divisions that I require an answer/bid from BY RETURN email please. the div list here will be annotated accordingly [options are: BID/NoBid] Div-10 Fire Protection Specialties REQUIRED Div-21 Fire Suppression Sprinklers etc REQUIRED Div-28 Life Safety Fire Alarms UNKNOWN as at 2018-08-23 o8:30. 14:37 2018-08-23: ELECTRICIANS Div-31-33 Ground OWNER Note there are red hydrants onsite Sometimes I do NOT know what divs are required. you will have to check, and advise me if you notice, & I shall update the !Notes.txt here. ---------------------------------------------------------------------------------------------------------- CALLOUT C for you to observe the PlanRoom Folders that have data. e.g.: Addenda, Plans, Pics, Docs you will need to check folders that may be added to from time to time, i won't always advise you. //====================================================================== CALLOUT Z TAKE NOTE: - Sprink Inspectors; - Hood Installer, - Hood Cleaner - Alarm Manager - Extinguisher & Cabinet Group be Advised: ALL FIRE SUPPRESSION DIVISIONS ARE SUBJECT TO: DIVISION 23 SECTION 23 05 50 - OPERATIONS & MAINTENANCE MANUALS; Identification of Pipe-Work; - Training of Maint Staff and other personel; Warranty. This is a CONDITION of the A201 Contract & Scope on ALL CONTRACTS. I don't want to hear about it! We MUST Supply/Deliver to the Customer: - Hands-on & Lecture TRAINING AND - we invite the local Fire Crew out to view the fittings and FDC & Riser Location. - We MUST Supply: - a Training Manual (Three Hard Copies) AND - Full-Size AS-BUILT drawings. (Three Hard Copies) - All Installation, Operation, Instruction & Repair Manuals for the installed equipment. - And all also cut onto a CD/DVD size disc. (Three Copies) Arun (Mr.) Compliance Manager 2016-Oct-17 //======================================================================