!Template ver: 11:47 2018-01-10 Mods: 2015-04-30 ---------------------------------------------------------------------------------------------------------- Company Invited: Fire Suppression Services (Salt Lake City, UT) CALLOUT A Due Date: 2018-Dec-04 Scheduled start date: Jan/21/2019 Completion date: Mar/15/2019 Manager: Rob Brown: rbrown@constructionone.com (614) 961-1119 General Contractor: Construction One, Inc, Project CoOrdinator: Lindsey Sheehe 101 E. Town Street, Suite 401 Columbus, Ohio 43215 Direct: (614) 235-0057 x 140 lsheehe@constructionone.com www.constructionone.com Mechanical: Architect: MJM Architects Nashville TN (615) 244-8170 Do NOT CONTACT OWNER OR ARCHITECT with questions. AHJ/FM: OWNER: Kornwasser Shopping Center Properties, LLC Do NOT CONTACT OWNER OR ARCHITECT with questions. 5670 Wilshire Blvd., suite 1250 Los Angeles, CA 90036 Sue Jagodzinski 145 South Fairfax Avenue. Suite 401 Los Angeles, CA 90036 323-965-1510 Do NOT CONTACT OWNER OR ARCHITECT with questions. PERMIT: eg: BLD201Y-##### PROJECT STATUS: (Open to Bid) START DATE: PROJECT LOCATION: Joann Fabric and Craft Store #2528 2330 E 3300 S Millcreek UT 84109 PARCEL INFORMATION: SF: 22,054 (21,500 per lease) Sales Taxable: YES/NO Note: TU = Tilt Up TI = Tenant Improvement DESCRIPTION also see DOCS folder. Length 205' 9 Width 238 total, JAS is 139'8 NOTE: Any keynotes that are titled “Landlord” are not part of this bid/contract. Project is an interior fit out of approx 24,445 sf. (Half of the building) see DOCS 2528 SLC-Survey Form Page 7 re wet Riser & Monitoring. The project is a stand-alone building located on a lot at the corner of S 2300 E and 3300 S. The previous tenant was Dan’s Market and the landlord is in the process of splitting the space into two tenants, one space for Jo-Ann and one space for DownEast Clothing. Do NOT CONTACT OWNER OR ARCHITECT with questions. Note: many items are owner furnished. Please refer to the “NAV materials provided by JAS” document. The tenant space is located directly adjacent to a baseball field, a tennis court, and residential housing. Will require new RTU's The 2" domestic water line is located along the rear west wall of building in newly constructed LLD room. Existing sprinkler system to be modified as required for new demolition/layout. The 6” fire riser is located along the rear South-West wall of the building in a newly constructed LLD room. PIV on wall. Yellow-Body, Green top hydrant at side walk. See Site Plan on A101. Fire Alarm Panel removed. Branch lines and upright heads throughout building. (Two Levels) Separate Alarm panel & Separate C-Monitoring, required for each space. (JoAnn & DownEast) AND: a noti of .... MEETINGS YOU MUST/MAY ATTEND in order to BID!!!! ---------------------------------------------------------------------------------------------------------- CALL OUT B Bid is for JoANN space only. Divisions that I require an answer/bid from BY RETURN email please. the div list here will be annotated accordingly [options are: BID/NoBid] Div-10 Fire Protection Specialties REQUIRED (Coordinate with National Account [CommercialFire] for 10lb ABC and brackets.) see Page 1 & P 6 Div-21 Fire Suppression Sprinklers etc REQUIRED (Has a RASCO Model E valve) see page 6 General Notes K Div-28 Life Safety Fire Alarms REQUIRED Div-31-33 Ground NoBid see Page 3 of Bid Set, KEYNOTE-LANDLORD SCOPE, item F: Sprinklers Fire Riser etc. Sometimes I do NOT know what divs are required. you will have to check, and advise me if you notice, & I shall update the !Notes.txt here. ---------------------------------------------------------------------------------------------------------- CALLOUT C for you to observe the PlanRoom Folders that have data. e.g.: Addenda, Plans, Pics, Docs you will need to check folders that may be added to from time to time, i won't always advise you. //====================================================================== CALLOUT Z TAKE NOTE: - Sprink Inspectors; - Hood Installer, - Hood Cleaner - Alarm Manager - Extinguisher & Cabinet Group be Advised: ALL FIRE SUPPRESSION DIVISIONS ARE SUBJECT TO: DIVISION 23 SECTION 23 05 50 - OPERATIONS & MAINTENANCE MANUALS; Identification of Pipe-Work; - Training of Maint Staff and other personel; Warranty. This is a CONDITION of the A201 Contract & Scope on ALL CONTRACTS. I don't want to hear about it! We MUST Supply/Deliver to the Customer: - Hands-on & Lecture TRAINING AND - we invite the local Fire Crew out to view the fittings and FDC & Riser Location. - We MUST Supply: - a Training Manual (Three Hard Copies) AND - Full-Size AS-BUILT drawings. (Three Hard Copies) - All Installation, Operation, Instruction & Repair Manuals for the installed equipment. - And all also cut onto a CD/DVD size disc. (Three Copies) Arun (Mr.) Compliance Manager 2016-Oct-17 //======================================================================