!Template ver: 11:47 2018-01-10 Mods: 2015-04-30 ---------------------------------------------------------------------------------------------------------- Company Invited: Fire Suppression Services (Salt Lake City, UT) CALLOUT A Due Date: Manager: Rebecca Mitchell (801) 663-1612 Tamara Halls (480) 343-1076 is the Head of the Site Mechanical: Architect: AHJ/FM: Matt Sacco (deputy FM) Lehi, was asked by Kerry Evans (FM) to call me.: UT State FM has jurisdiction as well. TENANT: TAMARA Halls PERMIT: eg: BLD201Y-##### PROJECT STATUS: (Awarded) (Open to Bid) START DATE: ASAP PROJECT LOCATION: Kimber Academy & School 46 N 300 W Lehi UT 84043 Job#: KASTI PARCEL INFORMATION: Sales Taxable: YES/NO Note: TI = Tenant Improvement DESCRIPTION SF: Approx 2,000-3,000 Certified quoted $5,000 Requires Alarm device install and panel monitored remotely. No exisiting sprinkler system. (not required) "At the beginning of this Summer last, they had 180 days to get a Professional System installed. per AHJ Matt: Design according to IFC 2015/NFPA-72 and, he tells me: UT State-FM told Local, to take care of it, so Lehi (Local) want system with remote monitoring to a CMS" (We FSS, can do all that. I set up at our CMS) AHJ local requires: Design, Submit Permit. Site has no drawings. No MEP set. Site is 100+ years old. School is open daily: 08:00 to 13:00 Tue, Wed, Thu only. Night it is vacant. Wet Suppression not required. AND: UNICAD contacted for Design, They have done other Kimber sites. (Mark Ellison) Rec'd pricing from Unicad, sent to Tamara qoute for $1,60 for DS&P 12:14 2018-12-11 Tamara wants someone to visit site to assess. ---------------------------------------------------------------------------------------------------------- CALL OUT B Divisions that I require an answer/bid from BY RETURN email please. the div list here will be annotated accordingly [options are: BID/NoBid] Div-10 Fire Protection Specialties NOT required Div-21 Fire Suppression Sprinklers etc NOT required Div-28 Life Safety Fire Alarms REQUIRED with REMOTE MONITORING Div-31-33 Ground NOT required Sometimes I do NOT know what divs are required. you will have to check, and advise me if you notice, & I shall update the !Notes.txt here. ---------------------------------------------------------------------------------------------------------- CALLOUT C for you to observe the PlanRoom Folders that have data. e.g.: Addenda, Plans, Pics, Docs you will need to check folders that may be added to from time to time, i won't always advise you. //====================================================================== CALLOUT Z TAKE NOTE: - Sprink Inspectors; - Hood Installer, - Hood Cleaner - Alarm Manager - Extinguisher & Cabinet Group be Advised: ALL FIRE SUPPRESSION DIVISIONS ARE SUBJECT TO: DIVISION 23 SECTION 23 05 50 - OPERATIONS & MAINTENANCE MANUALS; Identification of Pipe-Work; - Training of Maint Staff and other personel; Warranty. This is a CONDITION of the A201 Contract & Scope on ALL CONTRACTS. I don't want to hear about it! We MUST Supply/Deliver to the Customer: - Hands-on & Lecture TRAINING AND - we invite the local Fire Crew out to view the fittings and FDC & Riser Location. - We MUST Supply: - a Training Manual (Three Hard Copies) AND - Full-Size AS-BUILT drawings. (Three Hard Copies) - All Installation, Operation, Instruction & Repair Manuals for the installed equipment. - And all also cut onto a CD/DVD size disc. (Three Copies) Arun (Mr.) Compliance Manager 2016-Oct-17 //======================================================================