Design
Work on My Cost of fifteen cents per square foot.
Hence OUR charge rate is $0.18 per sqft (eighteen cents)
It is fixed.
DO NOT ADJUST CBPE pricing
//----------------------------------------------------------------------------------------

Permit:
Fee charged by AHJ office
WARNING: Ogden charges by % of our Contract Awarded price.

E.g. Award is: $153,000, then Ogden fee is $2,500.00
//----------------------------------------------------------------------------------------

Submit:
Includes BOUND documents.
The Cost to get 'it' all together to send to Building Inspector, FM, AHJ etc.
//----------------------------------------------------------------------------------------

Mobilization:
Mobilization-DeMobilisation-ReMobilization
How much is it going to cost me to get my team 's equipment there; and back out.
//----------------------------------------------------------------------------------------

Transport:
Travel etc. for Staff Vehicles
//----------------------------------------------------------------------------------------


FDC:
Fire Department Connection
It's pretty outside plate, snoot & clapper.
And the body inside.
And the LABOUR associated with it's installation.
WE now 'attempt' to use ductile iron units because of scrap-metal theives.
FDC- Our COST:
Note How do you want Clappers: reversible for Top outlet to riser?
A four-way brass body wall mount polished chrome
5426T-Auto-Spkr = $3,000.00

Ductile iron 4-way version is
5436-T = $2,800.00
add $120 for polished chrome plate
Lead time = 7-10 days.
MAKE SURE you have a room large enough to accommodate the manifold. see FDC pics

Potter Roemer siamese: 5710-A-DI  4 x 2-1/2 Ductile iron red = $70.00 2-way version.
 NB BackPlate 5962-68 xtra $100
//----------------------------------------------------------------------------------------

Riser:
 1x Risers
 1x  BFP 
  Control Valves, 
  2x Flow Switches 
  4x Tampers. 
  Head box. 
  Butterflys
  Vic 90
  Viic Flange or Vic-Groove.
  4 x 4"vics
Riser Pricing:
  4" C200 $1516

4" Flow Sw = $103
2" Angle V/v main drain = $68
vic
//----------------------------------------------------------------------------------------
StandPipe    often used interchangeably with the term: Riser
	What goes vertical through floor levels
	Usually in the stairwells
	In North America, a standpipe is a type of rigid water piping which is built into multi-story buildings
	in a vertical position or bridges in a horizontal position, to which fire hoses can be connected,
	allowing manual application of water to the fire.
	Within the context of a building or bridge, a standpipe serves the same purpose as a fire hydrant.
	Wet:	Used in Automatic Wet Sprinks. & is always filled with water
	Dry:	Used only be FireFighters. Must be within fire resistant chamber or well. And 18 m from the road.
In OUR context here:
	Standpipe runs up thru the stairwells  i.e. Vertical Wet Standpipe	Riser is the equipment in the Riser Room only
	Each level requires:
		Holes through floor for Drain, & Main pipe
		Holes thru wall into the main occupied corridors of said floor
				i.e. Sleeves or Core Drilling   (Core-Driller to remove slurry and cores)
		Non-Return, AKA Check, or Back-Flow prevention valve/s to prevent floor draining back to the standpipe.
		Monitored control & flow detection valves
		Manual isolation valves
		Connection to main drain
		FDC	Fire man connects to this to run hose UP to fight floor above.
		Pressures gauges
		Bracing & Riser Clamp
		Paint  WE exclude this

//----------------------------------------------------------------------------------------

AWP:
Charge TO customer is:
Height         Day       Wk       Month
19           115      225       475  Electric Scissor
26           125      265       575  Electric Scissor
32           150      375       755  Electric Scissor
30           415      875      1,750 Electric Boom
185cfm       300      750           Compressor
375cfm       550    1,100            Compressor

PickUp delivery: $75.00 each way, $150 each unit.
This is added to Mobilization DeMobilation

NB: YOU MUST ADD UT SALES TAX!
The Rate + Delivery + 'Other' are taxable.
Once you add all that up and the tax. that is OUR Cost that we charge
out. So, the cost for this cell is whatever the rate is above PLUS 8%

If you do same with PUD, that total is added to the MobDeMob.
The MarkUp is added at the bottom of the Bid spreadsheet.
8% accounts for Sales Tax  & the 'Other' Charges on a Rental invoice.
//----------------------------------------------------------------------------------------
Project Management
Add $30.00 Per Person for Drug Testing

//----------------------------------------------------------------------------------------
Freight:
  On our Suppliers invoices
//----------------------------------------------------------------------------------------
Finals:
to include:
O&M's
Inspection of riser/BFP Hydro-Card, tagging, Mounted schematic in riser room (on a board under
 clear perspex)
NFPA-25 document. NFPA-Above Ground & UG Cert.
Printing and binding of Other training manuals
//----------------------------------------------------------------------------------------

Training:
 Enter the number of hours. Alloted for training.
This is the TIME a trainer will spend  showing the client maint staff the system/s.

//----------------------------------------------------------------------------------------

Bond Groups:
   Additional Charge: for:
                  Bid Bond
   Performance Bond
         Payment Bond
   etc 
SEE THE 'NOTES' sheet
see: training folder file: 02-Bond.pdf
//----------------------------------------------------------------------------------------

Davis-Bacon:
http://www.dol.gov/compliance/laws/comp-dbra.htm
                                                                           Rates             Fringes      Total
SPRINKLER FITTER (Fire Sprinklers)......................$ 29.35            16.65        46.00