Contact: Rebecca Mitchell Ph. (801) 663-1612 Site: 46 North 300 West Lehi UT 84043 Job: Kimber Academy Private School. Child Care and School. Owner: Tamra Halls (Recent Purchase) Job#: KASTI SF: Approx 2,000-3,000 AHJ: Matt Sacco Lehi, was told by Kerry Evans to call me.: "At the beginning of this Summer last, they had 180 days to get a Professional System installed. per AHJ Matt: Design according to IFC 2015/NFPA-72 and, he tells me: UT State-FM told Local, to take care of it, so Lehi (Local) want system with remote monitoring to a CMS" (We FSS, can do all that. I set up at our CMS) AHJ local requires: Design, Submit Permit. Site has no drawings. No MEP set. Site is 100+ years old. School is open daily: 08:00 to 13:00 Tue, Wed, Thu only. Night it is vacant. Wet Suppression not required. FSS Requires: Price to: Measure/CAD the site, supply drawing to FSS with Device list, Design and battery calcs per standards outlined in Code, and FSS Design Scope/Standards. Shop drawings for install with submittals for Local AHJ in order to complete the Permit process. Client has Temporary Occupancy