!Template ver: 11:47 2018-01-10 Mods: 2015-04-30 ---------------------------------------------------------------------------------------------------------- Company Invited: Fire Suppression Services (Salt Lake City, UT) CALLOUT A Due Date: ASAP Manager: General Contractor: Cook Builders PO Box 684 380 S. Main St.. Centerville, UT 84014. (801) 295-3060 Nate@cookbuilder.com Tenant: Antonio (Tony) Valdez Tony Valdez. 8870 South 540 East. Sandy UT 84070 Phone: (801) 946-5241 <<===== MAIN Contact RealTaqu@gmail.com Manual Valdez (801) 828-6785 for Key to access site <<======= Mechanical: NONE Electrical: Hunt Electric $500 for FACP Breaker and outlet. Architect: Office DFK 333 W. Pierpont Ave #4 SLC. UT84101 (801) 447-5101 Brandon@Office-DFK.com (419) 575-0411 Brandon Broadstone AHJ/FM: Shirl White UFA. 2012 Codes. Knox box AND Knox locking Caps REQUIRED Note Current UT State Code. 2014 NEC 2015: IBC, IFC, IMC, IPC, IRC 2015: IECC, IEBC, IWUIC OWNER: Ron Spratling. 1970 PERMIT: eg: BLD2019-##### NONE as yet. Demo and TI required per AHJ PROJECT STATUS: (Awarded) (Open to Bid) START DATE: ASAP PROJECT LOCATION: 1869 East Murray-Holladay Rd. Holladay UT 84117 PARCEL INFORMATION: 22092270710000 Zoned: C-2 Occupancy: A-2 No Change Sales Taxable: YES Note: TU = Tilt Up. This is a TI = Tenant Improvement <<<------- DESCRIPTION Old KFC Building opposite the old Cottonwood Mall. This is a Demo then TI. 3,200 SF total. Area of Work 1,815 SF. Commercial Restaurant. Plus adding 200 SF Patio Burg/Flow monitor panel is missing. Wiring was NOT firewire or equivalent. Riser valves show need of maintenance. Did not observe the Calc Card. Must add locking caps AND KNOX box. Riser signs. FACP required, Remote Monitoring Required. Adam to do prelim inspection of wet suppression. Breaker for FACP is NOT CLEARLY parked at electrical Panel. AND: a noti of .... MEETINGS YOU MUST/MAY ATTEND in order to BID!!!! We did. on 2019-04-16. see MTG folder and PICS folder. Zach/Mike/Bill/Arun & Manual. ---------------------------------------------------------------------------------------------------------- CALL OUT B Divisions that I require an answer/bid from BY RETURN email please. the div list here will be annotated accordingly [options are: BID/NoBid] Div-10 Fire Protection Specialties REQUIRED (Extinguishers - Cabinets) Div-21 Fire Suppression Sprinklers etc REQUIRED Div-28 Life Safety Fire Alarms REQUIRED Div-31-33 Ground Not Required Sometimes I do NOT know what divs are required. you will have to check, and advise me if you notice, & I shall update the !Notes.txt here. ---------------------------------------------------------------------------------------------------------- CALLOUT C for you to observe the PlanRoom Folders that have data. e.g.: Addenda, Plans, Pics, Docs you will need to check folders that may be added to from time to time, i won't always advise you. //====================================================================== CALLOUT Z TAKE NOTE: - Sprink Inspectors; - Hood Installer, - Hood Cleaner - Alarm Manager - Extinguisher & Cabinet Group be Advised: ALL FIRE SUPPRESSION DIVISIONS ARE SUBJECT TO: DIVISION 23 SECTION 23 05 50 - OPERATIONS & MAINTENANCE MANUALS; Identification of Pipe-Work; - Training of Maint Staff and other personel; Warranty. This is a CONDITION of the A201 Contract & Scope on ALL CONTRACTS. I don't want to hear about it! We MUST Supply/Deliver to the Customer: - Hands-on & Lecture TRAINING AND - we invite the local Fire Crew out to view the fittings and FDC & Riser Location. - We MUST Supply: - a Training Manual (Three Hard Copies) AND - Full-Size AS-BUILT drawings. (Three Hard Copies) - All Installation, Operation, Instruction & Repair Manuals for the installed equipment. - And all also cut onto a CD/DVD size disc. (Three Copies) Arun (Mr.) Compliance Manager 2016-Oct-17 //======================================================================