!Template ver: 11:47 2018-01-10 Mods: 2015-04-30 ---------------------------------------------------------------------------------------------------------- 9:56 AM 9/17/2019 Stuart Gray in summary: He might say he hasn't seen a plan set so could not confirm what is required, without a full review. NB: Need One exterior HS (over FDC) and One interior Horn So use 120 Vac both to be on same circuit. & tied in to flow switch on riser valve stack. (Div-26 Electrical) From Englehard: Thanks for getting back to me. 1. Existing structure not sprinkled, and it does not have to be 2. Breezeway not heated at this point, and no intention of doing it. That is why we don’t want to sprinkle it. 3. Water supply and riser location will be directly under the stairs in the garage, in a sealed and heated utility space. It is not in as of yet, we have not started to frame, but the concrete work is done and we hope to be framing by next week. 4. Stuart Grey and Daniel Egbert have stated that they do not believe the breezeway or the attic need to be sprinkled; yet they obviously need me to get them a detailed construction document from someone like you and it needs to be 3rd party reviewed. On Sep 17, 2019, at 9:22 AM, Arun Mr wrote: I have a question or two: I am looking at the Englehard Residence and have a couple of questions, 1 - Is the Existing residence sprinklered? a - If not, does it have to be? (AHJ) 2 - Is the breezeway between the two building conditioned, (heated)? 3 - Water supply and riser location for the new building? is it in? 4 - What did AHJ Stuart Gray tell you? On Sep 11, 2019, at 9:43 AM, Arun Mr wrote: Do you have a Scope of Work. or Specs? Color etc. Cheers Company Invited: Fire Suppression Services (Salt Lake City, UT) CALLOUT A Due Date: Manager: Phone: Mechanical: Architect: SPN. 2091 E. Murray Holladay Rd. Holladay. 84117. 801 466-1250 Proj# 1903B General: Juab. Ulrich? AHJ/FM: Unified S Gray. 2006 Wildlife-Urban interface Code. OWNER: Bruce & Lisa Englehard (801) 631-9525 PERMIT: eg: BLD201Y-##### PROJECT STATUS: (Awarded) (Open to Bid) START DATE: PROJECT LOCATION: 11401 Mule Hollow Drive Ln Big Cottonwood Canyon Salt Lake City, UT 84121 Elevation: 7,800 ft It is up the Big Cottonwood cnyn by Silver Fork lodge. (elev: 7,800 ft above sea level) PARCEL INFORMATION: Sales Taxable: YES Note: TU = Tilt Up TI = Tenant Improvement DESCRIPTION 13-D, R-3 1,700 SF (930 and 770) Client claims 34 x 25 living space. AND: a noti of .... MEETINGS YOU MUST/MAY ATTEND in order to BID!!!! ---------------------------------------------------------------------------------------------------------- CALL OUT B Divisions that I require an answer/bid from BY RETURN email please. the div list here will be annotated accordingly [options are: BID/NoBid] Div-10 Fire Protection Specialties REQUIRED Div-21 Fire Suppression Sprinklers etc REQUIRED Div-26 Electrical REQUIRED Horn Strobes (120 Vac) Div-28 Life Safety Fire Alarms No Answer Div-31-33 Ground No Answer Sometimes I do NOT know what divs are required. you will have to check, and advise me if you notice, & I shall update the !Notes.txt here. ---------------------------------------------------------------------------------------------------------- CALLOUT C for you to observe the PlanRoom Folders that have data. e.g.: Addenda, Plans, Pics, Docs you will need to check folders that may be added to from time to time, i won't always advise you. //====================================================================== CALLOUT Z TAKE NOTE: - Sprink Inspectors; - Hood Installer, - Hood Cleaner - Alarm Manager - Extinguisher & Cabinet Group be Advised: ALL FIRE SUPPRESSION DIVISIONS ARE SUBJECT TO: DIVISION 23 SECTION 23 05 50 - OPERATIONS & MAINTENANCE MANUALS; Identification of Pipe-Work; - Training of Maint Staff and other personel; Warranty. This is a CONDITION of the A201 Contract & Scope on ALL CONTRACTS. I don't want to hear about it! We MUST Supply/Deliver to the Customer: - Hands-on & Lecture TRAINING AND - we invite the local Fire Crew out to view the fittings and FDC & Riser Location. - We MUST Supply: - a Training Manual (Three Hard Copies) AND - Full-Size AS-BUILT drawings. (Three Hard Copies) - All Installation, Operation, Instruction & Repair Manuals for the installed equipment. - And all also cut onto a CD/DVD size disc. (Three Copies) Arun (Mr.) Compliance Manager 2016-Oct-17 //======================================================================