Design Work on My Cost of fifteen cents per square foot. Hence OUR charge rate is $0.18 per sqft (eighteen cents) It is fixed. DO NOT ADJUST CBPE pricing //---------------------------------------------------------------------------------------- Permit: Fee charged by AHJ office WARNING: Ogden charges by % of our Contract Awarded price. E.g. Award is: $153,000, then Ogden fee is $2,500.00 //---------------------------------------------------------------------------------------- Submit: Includes BOUND documents. The Cost to get 'it' all together to send to Building Inspector, FM, AHJ etc. //---------------------------------------------------------------------------------------- Mobilization: Mobilization-DeMobilisation-ReMobilization How much is it going to cost me to get my team 's equipment there; and back out. //---------------------------------------------------------------------------------------- Transport: Travel etc. for Staff Vehicles //---------------------------------------------------------------------------------------- FDC: Fire Department Connection It's pretty outside plate, snoot & clapper. And the body inside. And the LABOUR associated with it's installation. WE now 'attempt' to use ductile iron units because of scrap-metal theives. FDC- Our COST: Note How do you want Clappers: reversible for Top outlet to riser? A four-way brass body wall mount polished chrome 5426T-Auto-Spkr = $3,000.00 Ductile iron 4-way version is 5436-T = $2,800.00 add $120 for polished chrome plate Lead time = 7-10 days. MAKE SURE you have a room large enough to accommodate the manifold. see FDC pics Potter Roemer siamese: 5710-A-DI 4 x 2-1/2 Ductile iron red = $70.00 2-way version. NB BackPlate 5962-68 xtra $100 //---------------------------------------------------------------------------------------- Riser: 1x Risers 1x BFP Control Valves, 2x Flow Switches 4x Tampers. Head box. Butterflys Vic 90 Viic Flange or Vic-Groove. 4 x 4"vics Riser Pricing: 4" C200 $1516 4" Flow Sw = $103 2" Angle V/v main drain = $68 vic //---------------------------------------------------------------------------------------- StandPipe often used interchangeably with the term: Riser What goes vertical through floor levels Usually in the stairwells In North America, a standpipe is a type of rigid water piping which is built into multi-story buildings in a vertical position or bridges in a horizontal position, to which fire hoses can be connected, allowing manual application of water to the fire. Within the context of a building or bridge, a standpipe serves the same purpose as a fire hydrant. Wet: Used in Automatic Wet Sprinks. & is always filled with water Dry: Used only be FireFighters. Must be within fire resistant chamber or well. And 18 m from the road. In OUR context here: Standpipe runs up thru the stairwells i.e. Vertical Wet Standpipe Riser is the equipment in the Riser Room only Each level requires: Holes through floor for Drain, & Main pipe Holes thru wall into the main occupied corridors of said floor i.e. Sleeves or Core Drilling (Core-Driller to remove slurry and cores) Non-Return, AKA Check, or Back-Flow prevention valve/s to prevent floor draining back to the standpipe. Monitored control & flow detection valves Manual isolation valves Connection to main drain FDC Fire man connects to this to run hose UP to fight floor above. Pressures gauges Bracing & Riser Clamp Paint WE exclude this //---------------------------------------------------------------------------------------- AWP: Charge TO customer is: Height Day Wk Month 19 115 225 475 Electric Scissor 26 125 265 575 Electric Scissor 32 150 375 755 Electric Scissor 30 415 875 1,750 Electric Boom 185cfm 300 750 Compressor 375cfm 550 1,100 Compressor PickUp delivery: $75.00 each way, $150 each unit. This is added to Mobilization DeMobilation NB: YOU MUST ADD UT SALES TAX! The Rate + Delivery + 'Other' are taxable. Once you add all that up and the tax. that is OUR Cost that we charge out. So, the cost for this cell is whatever the rate is above PLUS 8% If you do same with PUD, that total is added to the MobDeMob. The MarkUp is added at the bottom of the Bid spreadsheet. 8% accounts for Sales Tax & the 'Other' Charges on a Rental invoice. //---------------------------------------------------------------------------------------- Project Management Add $30.00 Per Person for Drug Testing //---------------------------------------------------------------------------------------- Freight: On our Suppliers invoices //---------------------------------------------------------------------------------------- Finals: to include: O&M's Inspection of riser/BFP Hydro-Card, tagging, Mounted schematic in riser room (on a board under clear perspex) NFPA-25 document. NFPA-Above Ground & UG Cert. Printing and binding of Other training manuals //---------------------------------------------------------------------------------------- Training: Enter the number of hours. Alloted for training. This is the TIME a trainer will spend showing the client maint staff the system/s. //---------------------------------------------------------------------------------------- Bond Groups: Additional Charge: for: Bid Bond Performance Bond Payment Bond etc SEE THE 'NOTES' sheet see: training folder file: 02-Bond.pdf //---------------------------------------------------------------------------------------- Davis-Bacon: http://www.dol.gov/compliance/laws/comp-dbra.htm Rates Fringes Total SPRINKLER FITTER (Fire Sprinklers)......................$ 29.35 16.65 46.00