!Template ver: 11:47 2018-01-10 Mods: 2015-04-30 ---------------------------------------------------------------------------------------------------------- Company Invited: Fire Suppression Services (Salt Lake City, UT) CALLOUT A Due Date: Manager: Phone: Mechanical: ELECTRICAL: Call RMP 1-877-508-5088 (oregon) There is 3-Phase service. Architect: AHJ/FM: SLC Corp OWNER: James Dumas (435) 655-5870 ex Hi West Distillery PERMIT: eg: BLD201Y-##### PROJECT STATUS: (Awarded) (Open to Bid) START DATE: PROJECT LOCATION: 1. 902 S Main st. old Midas bldg. PARCEL INFORMATION: Sales Taxable: YES Note: TI = Tenant Improvement DESCRIPTION 6,000 SF AND: a noti of .... MEETINGS YOU MUST/MAY ATTEND in order to BID!!!! ---------------------------------------------------------------------------------------------------------- CALL OUT B Divisions that I require an answer/bid from BY RETURN email please. the div list here will be annotated accordingly [options are: BID/NoBid] Div-10 Fire Protection Specialties REQUIRED Div-21 Fire Suppression Sprinklers etc REQUIRED Div-28 Life Safety Fire Alarms No Answer Div-31-33 Ground REQUIRED After looking at the map the best gestimate I can give ranges from $67000-$120000. That would be runing from the area the existing fire hydrant to the midas building running down the shoulder of the road. Assuming they will want side walk crossings replaced and 6" thick asphalt on road patch. Probably export all material in rad and import of back fill for trench in road. If we can tap into the line right in front of the Midas buildng then it would be $10000 or less Sometimes I do NOT know what divs are required. you will have to check, and advise me if you notice, & I shall update the !Notes.txt here. ---------------------------------------------------------------------------------------------------------- CALLOUT C for you to observe the PlanRoom Folders that have data. e.g.: Addenda, Plans, Pics, Docs you will need to check folders that may be added to from time to time, i won't always advise you. //====================================================================== CALLOUT Z TAKE NOTE: - Sprink Inspectors; - Hood Installer, - Hood Cleaner - Alarm Manager - Extinguisher & Cabinet Group be Advised: ALL FIRE SUPPRESSION DIVISIONS ARE SUBJECT TO: DIVISION 23 SECTION 23 05 50 - OPERATIONS & MAINTENANCE MANUALS; Identification of Pipe-Work; - Training of Maint Staff and other personel; Warranty. This is a CONDITION of the A201 Contract & Scope on ALL CONTRACTS. I don't want to hear about it! We MUST Supply/Deliver to the Customer: - Hands-on & Lecture TRAINING AND - we invite the local Fire Crew out to view the fittings and FDC & Riser Location. - We MUST Supply: - a Training Manual (Three Hard Copies) AND - Full-Size AS-BUILT drawings. (Three Hard Copies) - All Installation, Operation, Instruction & Repair Manuals for the installed equipment. - And all also cut onto a CD/DVD size disc. (Three Copies) Arun (Mr.) Compliance Manager 2016-Oct-17 //======================================================================