!Template ver: 11:47 2018-01-10 Mods: 2015-04-30 ------------------------------------------------------------------------------------------------ Company Invited: Fire Suppression Services (Salt Lake City, UT) CALLOUT A Due Date: ASAP Manager: Contacts: Mehran Tahmassebi with Tabriz Construction tabrizconst@yahoo.com 801-808-9382 Mehranjan@me.com Jay Mirrafie JMirrafie@gmail.com Architect: EPJ Architects 2619 W Alice Springs rd Riverton 84065 epJames3@gmail.com (801) 419-5482 Lane.Beeny@comcast.net (801) 568-9330 Mechanical and Electrical: Royal Engineering Provo UT 801 375-2228 Job# J20055 Elliott Breinholt (801) 913-2395 8:14 AM 1/12/2021 Aspen says he will call me. 10:41 AM 1/12/2021 sent me the CAD files. AHJ/FM: UFA Shirl White Oct-2020 WC3 did plan check NFPA-13, NFPA-72 OWNER: Arlington Investments LLC PERMIT: MILLCREEK200468 PROJECT STATUS: (Open to Bid) START DATE: early spring 2021 PROJECT LOCATION: 4576 S 900 E Millcreek UT 84117 Elev: 4,285 ft (West side of 900 E, cnr of Arcadia East Way) PARCEL INFORMATION: 22053260380000 4576 S 326-038 Sales Taxable: NO Note: New construction DESCRIPTION Hydrant going in in front Total SF=35,000 Ground: Garage & Retail side by side. 2nd & 3rd = Residential condos (18 condos, 9 on ea floor) Units Types- 5 typical types Building Outside dimensions 161ft x 70ft. 70ft-side Faces east on to 900 E NON-HEATED Basement Garage; NON-HEATED Attic (Flat roof tho') NFPA-13 FIRE SPRINKLER SYSTEM (IBC903.3.1.1) AND: a noti of .... MEETINGS YOU MUST/MAY ATTEND in order to BID!!!! -------------------------------------------------------------------------- CALL OUT B Divisions that I require an answer/bid from BY RETURN email please. the div list here will be annotated accordingly [options are: BID/NoBid] Div-10 Fire Protection Specialties Fire Extinguishers required. Div-21 Fire Suppression Sprinklers etc REQUIRED Div-26 Electrical No Answer Div-28 Life Safety Fire Alarms REQUIRED Div-31-33 Ground Not required Sometimes I do NOT know what divs are required. you will have to check, and advise me if you notice, & I shall update the !Notes.txt here. ---------------------------------------------------------------------------------------------------------- CALLOUT C for you to observe the PlanRoom Folders that have data. e.g.: Addenda, Plans, Pics, Docs you will need to check folders that may be added to from time to time, i won't always advise you. //====================================================================== CALLOUT Z TAKE NOTE: - Sprink Inspectors; - Hood Installer, - Hood Cleaner - Alarm Manager - Extinguisher & Cabinet Group be Advised: ALL FIRE SUPPRESSION DIVISIONS ARE SUBJECT TO: DIVISION 23 SECTION 23 05 50 - OPERATIONS & MAINTENANCE MANUALS; Identification of Pipe-Work; - Training of Maint Staff and other personel; Warranty. This is a CONDITION of the A201 Contract & Scope on ALL CONTRACTS. I don't want to hear about it! We MUST Supply/Deliver to the Customer: - Hands-on & Lecture TRAINING AND - we invite the local Fire Crew out to view the fittings and FDC & Riser Location. - We MUST Supply: - a Training Manual (Three Hard Copies) AND - Full-Size AS-BUILT drawings. (Three Hard Copies) - All Installation, Operation, Instruction & Repair Manuals for the installed equipment. - And all also cut onto a CD/DVD size disc. (Three Copies) Arun (Mr.) Compliance Manager 2016-Oct-17 //======================================================================