!Template ver: 11:47 2018-01-10 Mods: 2015-04-30 ---------------------------------------------------------------------------------------------------------- Company Invited: Fire Suppression Services (Salt Lake City, UT) CALLOUT A Due Date: Manager: Phone: Mechanical: Architect: AHJ/FM: Draper OWNER: Todd Kartchner (801) 301-5620 tkartchner@hotmail.com PERMIT: eg: BLD202Y-##### PROJECT STATUS: (Open to Bid) START DATE: Mar-2021 PROJECT LOCATION: Lot 5 Cinnamon Ridge Subdivision 1137 East Leambra lane. Draper UT 84020 PARCEL INFORMATION: Sales Taxable: YES Note: TU = Tilt Up DESCRIPTION New home. SF Main: 2105, Upper: 886 Basement: 2000 Garage: 991. Decks500SF Occ: R-3 Type 5 B-Construction. 13-D Smoke detectors w/battery backup required. see Permit Set General Note D. Fire Sprink Design must be FIRST approved by Designer of Record B4 send to AHJ add a Drawing Cabinet Between April 30 and Oct 31, temporary occupancies will NOT be granted. Passing of the final inspection is required prior to issuance of a Certificate of Occupancy. AND: a noti of .... MEETINGS YOU MUST/MAY ATTEND in order to BID!!!! ---------------------------------------------------------------------------------------------------------- CALL OUT B Divisions that I require an answer/bid from BY RETURN email please. the div list here will be annotated accordingly [options are: BID/NoBid] Div-10 Fire Protection Specialties No Div-21 Fire Suppression Sprinklers etc REQUIRED Div-26 Electrical No Answer Div-28 Life Safety Fire Alarms REQUIRED Div-31-33 Ground No Answer Sometimes I do NOT know what divs are required. you will have to check, and advise me if you notice, & I shall update the !Notes.txt here. ---------------------------------------------------------------------------------------------------------- CALLOUT C for you to observe the PlanRoom Folders that have data. e.g.: Addenda, Plans, Pics, Docs you will need to check folders that may be added to from time to time, i won't always advise you. //====================================================================== CALLOUT Z TAKE NOTE: - Sprink Inspectors; - Hood Installer, - Hood Cleaner - Alarm Manager - Extinguisher & Cabinet Group be Advised: ALL FIRE SUPPRESSION DIVISIONS ARE SUBJECT TO: DIVISION 23 SECTION 23 05 50 - OPERATIONS & MAINTENANCE MANUALS; Identification of Pipe-Work; - Training of Maint Staff and other personel; Warranty. This is a CONDITION of the A201 Contract & Scope on ALL CONTRACTS. I don't want to hear about it! We MUST Supply/Deliver to the Customer: - Hands-on & Lecture TRAINING AND - we invite the local Fire Crew out to view the fittings and FDC & Riser Location. - We MUST Supply: - a Training Manual (Three Hard Copies) AND - Full-Size AS-BUILT drawings. (Three Hard Copies) - All Installation, Operation, Instruction & Repair Manuals for the installed equipment. - And all also cut onto a CD/DVD size disc. (Three Copies) Arun (Mr.) Compliance Manager 2016-Oct-17 //======================================================================