!Template ver: 11:47 2018-01-10 Mods: 2015-04-30 ---------------------------------------------------------------------------------------------------------- Company Invited: Fire Suppression Services (Salt Lake City, UT) CALLOUT A Due Date: Manager: Ron MacDonald Phone: Mechanical: Epic Engineering Heber City (Main Office) 50 East 100 South Heber City, UT 84032 435.654.6600 Architect: AHJ/FM: Clint Neering OWNER: Jim Hoffman PERMIT: eg: BLD202Y-##### PROJECT STATUS: (Awarded) (Open to Bid) START DATE: 2021-03-12 PROJECT LOCATION: Wasatch Crest Recovery 425 Moulton Lane Heber UT 84032 PARCEL INFORMATION: Sales Taxable: YES/NO Note: TI = Tenant Improvement DESCRIPTION Code change "With their current occupant load they fall into an I1 occupancy. State code reduces the fire suppression standard to an NFPA 13R for Low Rise Residential Occupancies. They need a system that meets NFPA 13R and NFPA 72. The low frequency was from me trying to explain what is needed above what they currently have. They are currently installed for an NFPA 13D system which only requires an audible horn in a central location. Hence the “panel” that I don’t believe is a listed panel" Remove existing panel/devices and install FACP w/devices per Code 13-R; I-1 There is two-foot truss space between floors according to Ron Four floors. Floors 2 & 3 have bedrooms add contactors to hood suppression system to connect to FACP. (Tim Strickland) AND: a noti of .... MEETINGS YOU MUST/MAY ATTEND in order to BID!!!! ---------------------------------------------------------------------------------------------------------- CALL OUT B Divisions that I require an answer/bid from BY RETURN email please. the div list here will be annotated accordingly [options are: BID/NoBid] Div-10 Fire Protection Specialties REQUIRED Div-21 Fire Suppression Sprinklers etc REQUIRED Div-26 Electrical Done by Others Div-28 Life Safety Fire Alarms REQUIRED Div-31-33 Ground Done by Others Sometimes I do NOT know what divs are required. you will have to check, and advise me if you notice, & I shall update the !Notes.txt here. ---------------------------------------------------------------------------------------------------------- CALLOUT C for you to observe the PlanRoom Folders that have data. e.g.: Addenda, Plans, Pics, Docs you will need to check folders that may be added to from time to time, i won't always advise you. //====================================================================== CALLOUT Z TAKE NOTE: - Sprink Inspectors; - Hood Installer, - Hood Cleaner - Alarm Manager - Extinguisher & Cabinet Group be Advised: ALL FIRE SUPPRESSION DIVISIONS ARE SUBJECT TO: DIVISION 23 SECTION 23 05 50 - OPERATIONS & MAINTENANCE MANUALS; Identification of Pipe-Work; - Training of Maint Staff and other personel; Warranty. This is a CONDITION of the A201 Contract & Scope on ALL CONTRACTS. I don't want to hear about it! We MUST Supply/Deliver to the Customer: - Hands-on & Lecture TRAINING AND - we invite the local Fire Crew out to view the fittings and FDC & Riser Location. - We MUST Supply: - a Training Manual (Three Hard Copies) AND - Full-Size AS-BUILT drawings. (Three Hard Copies) - All Installation, Operation, Instruction & Repair Manuals for the installed equipment. - And all also cut onto a CD/DVD size disc. (Three Copies) Arun (Mr.) Compliance Manager 2016-Oct-17 //======================================================================