!Template ver: 11:47 2018-01-10 Mods: 2015-04-30 ---------------------------------------------------------------------------------------------------------- Company Invited: Fire Suppression Services (Salt Lake City, UT) CALLOUT A Due Date: General Contractor: Sylvia Pham | Bid Coordinator Weekes Construction, Inc. Cell 864-905-0545 spham@weekesconstruction.com PO Box 17977, Greenville, SC 29606 Overnight: 237 Rhett St, Greenville, SC 29601 Manager: Henderson Eng. from Kansas Phone: see G0-0 in general notes folder. Mechanical: Architect: BRR Architecture Christina Gagnon 913 236-3490 AHJ/FM: City of Farmington Eric Miller: (801) 939-9218 emiller@farmington.utah.com FM: James Weston (801) 451-2842 OWNER: CenterCal Properties 4500 West 13400 South Riverton. UT 84096 Attn: David Gruenfeldt (310) 341-5395 dGruenfeldt@centercal.com PERMIT: eg: BLD202Y-##### PROJECT STATUS: (Awarded) (Open to Bid) START DATE: March-2021 PROJECT LOCATION: Athletica 230 NE Promontory Space C-120 Farmington UT 84025 TENANT: GAP inc. 504 Pasadena Rd. Pasadena, MD 21122 Construction PM: Todd Tyson 410 241-2466 PARCEL INFORMATION: Sales Taxable: YES Note: TI = Tenant Improvement DESCRIPTION 3,700 SF, Ground, Mezzanine, Storage and Office spaces.(two floors) Occupancy: M (Mercantile) Type II-A Good morning, Arun! Does Fire Suppression Services have questions about the Athleta at Station Park in Farmington, Ut? SCOPE: • Design and install system to provide protection for new tenant layout meeting AHJ and LL requirements. Include all design engineering, and permitting fees required. Note what is on the drawing is only schematic. Subcontractor is solely responsible for design to meet code/AHJ/LL requirements. AND: a noti of .... MEETINGS YOU MUST/MAY ATTEND in order to BID!!!! ---------------------------------------------------------------------------------------------------------- CALL OUT B Divisions that I require an answer/bid from BY RETURN email please. the div list here will be annotated accordingly [options are: BID/NoBid] Div-10 Fire Protection Specialties not required Div-21 Fire Suppression Sprinklers etc REQUIRED Div-26 Electrical not required Div-28 Life Safety Fire Alarms Done by others Div-31-33 Ground not required Sometimes I do NOT know what divs are required. you will have to check, and advise me if you notice, & I shall update the !Notes.txt here. ---------------------------------------------------------------------------------------------------------- CALLOUT C for you to observe the PlanRoom Folders that have data. e.g.: Addenda, Plans, Pics, Docs you will need to check folders that may be added to from time to time, i won't always advise you. //====================================================================== CALLOUT Z TAKE NOTE: - Sprink Inspectors; - Hood Installer, - Hood Cleaner - Alarm Manager - Extinguisher & Cabinet Group be Advised: ALL FIRE SUPPRESSION DIVISIONS ARE SUBJECT TO: DIVISION 23 SECTION 23 05 50 - OPERATIONS & MAINTENANCE MANUALS; Identification of Pipe-Work; - Training of Maint Staff and other personel; Warranty. This is a CONDITION of the A201 Contract & Scope on ALL CONTRACTS. I don't want to hear about it! We MUST Supply/Deliver to the Customer: - Hands-on & Lecture TRAINING AND - we invite the local Fire Crew out to view the fittings and FDC & Riser Location. - We MUST Supply: - a Training Manual (Three Hard Copies) AND - Full-Size AS-BUILT drawings. (Three Hard Copies) - All Installation, Operation, Instruction & Repair Manuals for the installed equipment. - And all also cut onto a CD/DVD size disc. (Three Copies) Arun (Mr.) Compliance Manager 2016-Oct-17 //======================================================================